Custom gift bags in bulk for party favors, holiday campaigns, retail gifting, ecommerce packaging, and private label merchandising.
Natural, white, or colored kraft — twisted or flat handles, various sizes.
Art paper with matte/gloss lamination for premium retail gifting.
Custom artwork, seasonal themes, birthday, holiday designs.
Small bags for candy, treats, party favors — drawstring or fold-top closure.
Rope or ribbon handles, reinforced bottom, luxury retail packaging.
Integrated die-cut handles — no separate rope/paper handle.
Flexo for repeat patterns; offset for full-color photo designs. Hot stamping and spot UV for premium retail branding.
| Bag types | Kraft, coated art paper, favor bags, euro tote, die-cut handle |
|---|---|
| Sizes | Custom — common range: small (5×7"), medium (8×10"), large (10×13"), jumbo (16×19") |
| Paper weight | 100–250 gsm depending on bag type and load capacity |
| Handles | Twisted paper, flat paper, cotton rope, ribbon, or die-cut integrated |
| Printing | Flexographic or offset 1–6 colors; spot colors or CMYK |
| Finish | Matte/gloss lamination, spot UV, hot stamping available |
| MOQ | From 5,000 pcs per design (indicative — confirmed per spec) |
| Sample lead time | 10–12 days after artwork and structure approval |
| Bulk lead time | 25–35 days depending on complexity and quantity |
| Packaging | Flat-packed in master cartons; retail-ready bundling optional |
| Compliance | Food-safe inks available for food-contact bags; recyclable paper options |
Cartons of flat-packed bags — lowest cost for warehouse distribution.
Pre-counted sets shrink-wrapped or banded for retail shelf.
Bags with pre-punched holes for retail hang tags.
Buyer-specified carton labels, barcodes, packing lists for import.
Figures below are indicative and confirmed per final specification during quotation.
| MOQ | From 5,000 pcs per design (indicative) |
|---|---|
| Sample | 10–12 days; sample fee refundable on bulk order |
| Bulk lead time | 25–35 days by quantity and print method |
| Payment | 30% deposit, 70% balance before shipment (T/T) |
| Shipping | FOB Ningbo / Shanghai; sea, air, or express |
Clear input shortens quotation time and avoids sample rework. Use this checklist when sending a new program.
Type, size, material, print area, color count, target quantity per SKU.
AI/EPS/PDF files, Pantone colors, barcode files, and reference photos.
Bulk carton, retail box, header card, polybag, insert, or mixed-SKU set.
Destination country, safety standard, food-contact needs, and labeling language.
Target ship date, FOB/CIF/DDP terms, forwarder details, and carton limits.
Who signs off artwork, sample, pre-production proof, and final packing.
We prepare packaging details that buyers need after the product leaves the factory — not only the product itself.
| Barcode / SKU | UPC/EAN barcode printing or label application; SKU codes on retail pack and master carton. |
|---|---|
| Shelf display | Hang holes, header cards, window boxes, PDQ display trays, and shelf-ready cartons. |
| Language & warnings | Multi-language labels, choking hazard warnings, age grading, food-contact statements. |
| Packing photos | Pre-shipment packing photos showing retail pack, inner carton, master carton, and marks. |
| Repeat order file | Approved sample photos, artwork version, materials, print colors, and carton specs recorded. |
Importers and retailers need clear files for internal approval, customs, warehouse receiving, and repeat orders.
| Before production | Quotation sheet, proforma invoice, artwork proof, material confirmation, sample invoice. |
|---|---|
| During production | Production status photos, first-article print review, packing plan confirmation. |
| Before shipment | Packing list, commercial invoice, carton mark sheet, pre-shipment photos, test reports if ordered. |
| For repeat orders | Last approved sample reference, artwork version, color standard, carton dimensions, loading notes. |
We arrange third-party testing for destination markets on request. Test reports and material compliance documents are provided per buyer requirements.
| Standard | Scope | Availability |
|---|---|---|
| EN 71-1/2/3 | Toy safety (EU) | Testing reports available upon request |
| ASTM F963 | Toy safety (US) | Testing reports available upon request |
| REACH | Chemical substances (EU) | Declaration available upon request |
| FDA Food Contact | Paper tableware (US) | Material compliance docs upon request |
| CA Prop 65 | Chemical warnings (California) | Compliance statement upon request |
Yes. Seasonal gift bag programs can include custom prints, handles, tags, pack quantities, and carton marks for your market.
Yes. We coordinate colors and artwork with balloons, tableware, banners, and backdrops so your retail collection stays consistent.
Typically from 5,000 pcs per custom-printed design. Plain stock bags have lower minimums but limited color range.
Yes. Send width, height, gusset/depth, paper material, handle type, print coverage, and quantity for a detailed quote.
Yes. Recycled kraft, FSC-certified paper, and water-based inks are available for sustainability-focused programs.
Yes. Barcodes can be printed on bags or applied as labels. We can also attach hang tags or pack with retail-ready inserts.
Twisted paper, flat paper, cotton rope, grosgrain ribbon, or die-cut integrated handles — each affects cost and look.
Attach artwork or describe the target product, quantity, package format, and destination market for a detailed quotation.