Latex · Foil · Mylar · Confetti

Custom Balloons with Logo

Logo balloons, color-matched packs, themed assortments, and promotional balloon programs with sampling support before bulk production.

custom balloonscustom balloons with logocustom printed balloonspersonalized balloonscustom photo balloonscustom mylar balloons
Custom Balloons with Logo manufactured in Zhejiang, China
MOQ 3,000 pcs / design
Sizes 5" – 36" latex; 16"/32" foil
Print 1–4 color screen print + Pantone
Lead time 20–35 days
Product range

Available Types & Variants

Latex Balloons

5", 10", 12", 18", 36" — helium-grade natural latex, standard / metallic / pastel / agate finishes.

Foil & Mylar

18" shapes, 16"/32" number & letter foils, star, heart, and custom die-cut foil shapes.

Confetti Balloons

Clear latex pre-filled with paper or mylar confetti for premium event packs.

Bobo / Bubble

18"–24" stretch PVC clear balloons for layered prints and LED inserts.

LED Balloons

Light-up balloons with replaceable button-cell batteries for night events.

Garland Kits

Assorted-size balloon arch and garland kits in retail-ready pack counts.

Specifications

Technical & Order Details

Screen printing suits solid logos on latex; foil balloons use heat transfer or pre-printed designs. Full-wrap and 360° printing available on 11"–12" latex.

Balloon types Latex, foil/mylar, confetti, bobo, number/letter, LED, garland kits
Common sizes Latex 5"–36"; foil numbers 16"/32"; foil shapes 18"
Material 100% natural latex; BOPP/nylon foil; food-safe inks
Printing 1–4 color screen print, full-wrap, 360° wrap, foil stamp
Color matching Standard color chart or Pantone (PMS) matching
MOQ From 3,000 pcs per design (indicative — confirmed per spec)
Sample lead time 7–10 days after artwork approval
Bulk lead time 20–35 days depending on quantity and print
Packaging Polybag, header card, printed box, or master carton
Compliance EN71-1/2/3, ASTM F963, REACH test reports on request
Packaging options

Packing Formats

Polybag (bulk)

Loose count per polybag, master carton — lowest cost for distributors.

Header card

Retail hang-pack with printed header — shelf-ready for retail chains.

Printed gift box

Branded box for premium balloon sets and event kits.

Custom carton

Buyer carton marks, barcodes, and packing list for import.

Applications

Common Use Cases

BirthdayWeddingBaby showerGraduationCorporate brandingGrand openingHalloweenChristmasNew Year
Ordering terms

MOQ, Sampling & Lead Time

Figures below are indicative and confirmed per final specification during quotation.

MOQ From 3,000 pcs per printed design (indicative)
Sample 7–10 days; sample fee refundable on bulk order
Bulk lead time 20–35 days by quantity and print method
Payment 30% deposit, 70% balance before shipment (T/T)
Shipping FOB Ningbo / Shanghai; sea, air, or express via your forwarder
RFQ checklist

Send These Details for a Faster Quote

Clear input shortens quotation time and avoids sample rework. Use this checklist when sending a new program.

Product spec

Type, size, material, print area, color count, target quantity per SKU.

Artwork package

AI/EPS/PDF files, Pantone colors, barcode files, and reference photos.

Pack format

Bulk carton, retail box, header card, polybag, insert, or mixed-SKU set.

Market rules

Destination country, safety standard, food-contact needs, and labeling language.

Delivery plan

Target ship date, FOB/CIF/DDP terms, forwarder details, and carton limits.

Approval path

Who signs off artwork, sample, pre-production proof, and final packing.

Retail readiness

Built for Shelf, Warehouse & Ecommerce Handling

We prepare packaging details that buyers need after the product leaves the factory — not only the product itself.

Barcode / SKU UPC/EAN barcode printing or label application; SKU codes on retail pack and master carton.
Shelf display Hang holes, header cards, window boxes, PDQ display trays, and shelf-ready cartons.
Language & warnings Multi-language labels, choking hazard warnings, age grading, food-contact statements.
Packing photos Pre-shipment packing photos showing retail pack, inner carton, master carton, and marks.
Repeat order file Approved sample photos, artwork version, materials, print colors, and carton specs recorded.
Buyer documents

Documents We Prepare for Procurement Teams

Importers and retailers need clear files for internal approval, customs, warehouse receiving, and repeat orders.

Before production Quotation sheet, proforma invoice, artwork proof, material confirmation, sample invoice.
During production Production status photos, first-article print review, packing plan confirmation.
Before shipment Packing list, commercial invoice, carton mark sheet, pre-shipment photos, test reports if ordered.
For repeat orders Last approved sample reference, artwork version, color standard, carton dimensions, loading notes.
Testing & compliance

Market Standards & Testing Reports

We arrange third-party testing for destination markets on request. Test reports and material compliance documents are provided per buyer requirements.

Standard Scope Availability
EN 71-1/2/3 Toy safety (EU) Testing reports available upon request
ASTM F963 Toy safety (US) Testing reports available upon request
REACH Chemical substances (EU) Declaration available upon request
FDA Food Contact Paper tableware (US) Material compliance docs upon request
CA Prop 65 Chemical warnings (California) Compliance statement upon request
Procurement questions

Custom Balloons with Logo FAQ

Can you print our company logo on balloons?

Yes. Send vector artwork (AI/EPS/PDF), Pantone colors, balloon type, size, and quantity, and we'll confirm print feasibility and pricing.

What is the MOQ for custom printed balloons?

Typically from 3,000 pcs per design for screen-printed latex. Foil and specialty balloons may differ — we confirm per spec.

Can you make personalized balloons with a photo, name, or custom shape?

Yes. We produce photo balloons, name and letter balloons, custom-shaped die-cut foil and mylar balloons, and full-color printed designs. Send your image or text and the target size for sampling.

Do you make foil number balloons for resale?

Yes. 16" and 32" number and letter foils in gold, silver, rose gold, and custom colors, packed for retail or bulk.

Can balloons match other party items in one theme?

Yes. We coordinate balloon colors and artwork with tableware, banners, and gift bags for a complete collection.

Are your balloons safe for the US and EU markets?

We arrange EN71, ASTM F963, and REACH testing on request to match your destination market requirements.

Can you produce licensed character balloons?

Only with valid buyer authorization for protected characters or brands. We do not produce unlicensed IP.

What artwork format do you need?

Vector files (AI, EPS, PDF) are preferred. We can review high-resolution raster art for feasibility before sampling.

Start a quote

Send Specs for Custom Balloons with Logo

Attach artwork or describe the target product, quantity, package format, and destination market for a detailed quotation.