Custom banners, bunting, backdrop boards, decorative sets, and seasonal party decoration kits from a factory partner built for repeat orders.
Triangle pennant banners in paper or cardstock — single or double-sided print.
Cotton or polyester triangle banners — reusable, premium feel.
"Happy Birthday", "Congrats", custom text — paper or foil letters on string.
Cardboard or foam-core photo backdrops with custom prints — foldable or rigid.
Pom-poms, honeycomb balls, tissue fans, spiral garlands.
Complete decoration sets for birthdays, holidays, graduations — retail-ready packaging.
Paper bunting uses offset or digital print; fabric uses dye-sublimation or screen print. Backdrops can be single-use paper or reusable fabric.
| Product types | Paper/fabric bunting, letter banners, backdrops, hanging decorations, themed kits |
|---|---|
| Bunting sizes | Triangle pennants 6"–10" per flag; banner lengths 2–5 meters standard (custom available) |
| Backdrop sizes | Custom — common: 1×1.5m, 1.5×2m, 2×2.5m (foldable or rigid mounting) |
| Materials | Paper, cardstock, cotton, polyester, foil, tissue, honeycomb, foam-core |
| Printing | Offset or digital for paper; dye-sub or screen print for fabric; foil stamping for metallic |
| Finish | Matte, gloss, metallic foil, glitter coating |
| MOQ | From 500–2,000 pcs per item (indicative — lower for kits, higher for single banners) |
| Sample lead time | 10–14 days after artwork and structure approval |
| Bulk lead time | 20–30 days depending on item complexity and quantity |
| Packaging | Polybag with header card, printed box for kits, master cartons for bulk |
| Compliance | Fire-retardant treatments available on request for commercial venues |
Single-item hang packs for retail pegboard or shelf.
Complete party decoration set in branded retail-ready box.
Flat-packed banners and decorations for distributor warehouses.
Buyer-specified labels, barcodes, packing lists for import.
Figures below are indicative and confirmed per final specification during quotation.
| MOQ | From 500–2,000 pcs per item (indicative) |
|---|---|
| Sample | 10–14 days; sample fee refundable on bulk order |
| Bulk lead time | 20–30 days by item and quantity |
| Payment | 30% deposit, 70% balance before shipment (T/T) |
| Shipping | FOB Ningbo / Shanghai; sea, air, or express |
Clear input shortens quotation time and avoids sample rework. Use this checklist when sending a new program.
Type, size, material, print area, color count, target quantity per SKU.
AI/EPS/PDF files, Pantone colors, barcode files, and reference photos.
Bulk carton, retail box, header card, polybag, insert, or mixed-SKU set.
Destination country, safety standard, food-contact needs, and labeling language.
Target ship date, FOB/CIF/DDP terms, forwarder details, and carton limits.
Who signs off artwork, sample, pre-production proof, and final packing.
We prepare packaging details that buyers need after the product leaves the factory — not only the product itself.
| Barcode / SKU | UPC/EAN barcode printing or label application; SKU codes on retail pack and master carton. |
|---|---|
| Shelf display | Hang holes, header cards, window boxes, PDQ display trays, and shelf-ready cartons. |
| Language & warnings | Multi-language labels, choking hazard warnings, age grading, food-contact statements. |
| Packing photos | Pre-shipment packing photos showing retail pack, inner carton, master carton, and marks. |
| Repeat order file | Approved sample photos, artwork version, materials, print colors, and carton specs recorded. |
Importers and retailers need clear files for internal approval, customs, warehouse receiving, and repeat orders.
| Before production | Quotation sheet, proforma invoice, artwork proof, material confirmation, sample invoice. |
|---|---|
| During production | Production status photos, first-article print review, packing plan confirmation. |
| Before shipment | Packing list, commercial invoice, carton mark sheet, pre-shipment photos, test reports if ordered. |
| For repeat orders | Last approved sample reference, artwork version, color standard, carton dimensions, loading notes. |
We arrange third-party testing for destination markets on request. Test reports and material compliance documents are provided per buyer requirements.
| Standard | Scope | Availability |
|---|---|---|
| EN 71-1/2/3 | Toy safety (EU) | Testing reports available upon request |
| ASTM F963 | Toy safety (US) | Testing reports available upon request |
| REACH | Chemical substances (EU) | Declaration available upon request |
| FDA Food Contact | Paper tableware (US) | Material compliance docs upon request |
| CA Prop 65 | Chemical warnings (California) | Compliance statement upon request |
Yes. We support Halloween, Christmas, New Year, graduation, birthday, wedding, and promotional programs with custom or stock themes.
Yes. Provide the target size, structure (foldable or rigid), material, print area, and packing requirement for a quote.
Yes. We can quote a full coordinated party program instead of separate unrelated items — same artwork and colors across categories.
Typically from 1,000–2,000 pcs for custom-printed paper bunting. Stock designs and fabric bunting may have different minimums.
Yes. Fire-retardant treatments are available for commercial venues, event rentals, and markets with fire safety requirements.
Yes. We can bundle banners, hanging decorations, and accessories in a themed retail box with barcode and shelf-ready packaging.
Dye-sublimation for full-color photo-realistic prints; screen printing for solid colors and simple graphics.
Attach artwork or describe the target product, quantity, package format, and destination market for a detailed quotation.