Cups · Plates · Napkins · Coordinated Sets

Paper Cups with Logo

Coordinated tableware sets with custom paper cups, plates, and napkins for party ranges, catering programs, retail packs, and branded events.

paper cups with logocustom paper cupsprinted paper platesparty tableware wholesale
Paper Cups with Logo manufactured in Zhejiang, China
MOQ 10,000 pcs / item
Sizes 7oz–22oz cups; 7"–10" plates
Print Flexo / offset 1–6 colors
Lead time 25–40 days
Product range

Available Types & Variants

Single-wall cups

7oz, 9oz, 12oz, 16oz, 22oz — cold drinks, hot drinks with sleeves.

Double-wall cups

8oz, 12oz — insulated for hot beverages without sleeve.

Paper plates

7", 9", 10" round; rectangular and compartment plates for catering.

Napkins

Beverage (5"×5"), luncheon (6.5"×6.5"), dinner (8"×8") — 1–3 ply.

Paper straws

Solid, striped, and custom-printed straws to match cup designs.

Coordinated sets

Matching cups, plates, napkins, and straws in one retail-ready pack.

Specifications

Technical & Order Details

Flexographic printing for repeat patterns and large runs; offset for full-color photo-realistic designs. Cups printed pre-forming; plates can be full-surface or rim-only.

Product types Single/double-wall cups, paper plates, napkins, straws, coordinated sets
Cup sizes 7oz, 9oz, 12oz, 16oz, 22oz (single-wall); 8oz, 12oz (double-wall)
Plate sizes 7", 9", 10" round; rectangular and compartment formats
Napkin sizes 5"×5", 6.5"×6.5", 8"×8" (1–3 ply)
Material Food-grade PE-coated paper (cups); uncoated or PE-coated (plates); tissue paper (napkins)
Printing Flexographic or offset 1–6 colors; spot colors or CMYK
Color matching Pantone (PMS) or CMYK process
MOQ From 10,000 pcs per item (indicative — confirmed per design)
Sample lead time 10–14 days after artwork approval
Bulk lead time 25–40 days depending on complexity and quantity
Packaging Shrink-wrapped sleeves, retail-ready boxes, or master cartons
Compliance FDA food contact compliance; test reports on request
Packaging options

Packing Formats

Shrink sleeves

Stacked counts in clear poly sleeve — standard wholesale format.

Retail box

Branded printed box with barcode for shelf display.

Party pack set

Coordinated cup, plate, napkin, and straw set in one retail-ready pack.

Master cartons

Bulk export cartons with buyer-specified marks and packing lists.

Applications

Common Use Cases

Birthday partiesCatering servicesEvent rentalsRetail party storesCorporate eventsFood trucksCoffee shopsSeasonal campaigns
Ordering terms

MOQ, Sampling & Lead Time

Figures below are indicative and confirmed per final specification during quotation.

MOQ From 10,000 pcs per item (indicative)
Sample 10–14 days; sample fee refundable on bulk order
Bulk lead time 25–40 days by quantity and print method
Payment 30% deposit, 70% balance before shipment (T/T)
Shipping FOB Ningbo / Shanghai; sea, air, or express
RFQ checklist

Send These Details for a Faster Quote

Clear input shortens quotation time and avoids sample rework. Use this checklist when sending a new program.

Product spec

Type, size, material, print area, color count, target quantity per SKU.

Artwork package

AI/EPS/PDF files, Pantone colors, barcode files, and reference photos.

Pack format

Bulk carton, retail box, header card, polybag, insert, or mixed-SKU set.

Market rules

Destination country, safety standard, food-contact needs, and labeling language.

Delivery plan

Target ship date, FOB/CIF/DDP terms, forwarder details, and carton limits.

Approval path

Who signs off artwork, sample, pre-production proof, and final packing.

Retail readiness

Built for Shelf, Warehouse & Ecommerce Handling

We prepare packaging details that buyers need after the product leaves the factory — not only the product itself.

Barcode / SKU UPC/EAN barcode printing or label application; SKU codes on retail pack and master carton.
Shelf display Hang holes, header cards, window boxes, PDQ display trays, and shelf-ready cartons.
Language & warnings Multi-language labels, choking hazard warnings, age grading, food-contact statements.
Packing photos Pre-shipment packing photos showing retail pack, inner carton, master carton, and marks.
Repeat order file Approved sample photos, artwork version, materials, print colors, and carton specs recorded.
Buyer documents

Documents We Prepare for Procurement Teams

Importers and retailers need clear files for internal approval, customs, warehouse receiving, and repeat orders.

Before production Quotation sheet, proforma invoice, artwork proof, material confirmation, sample invoice.
During production Production status photos, first-article print review, packing plan confirmation.
Before shipment Packing list, commercial invoice, carton mark sheet, pre-shipment photos, test reports if ordered.
For repeat orders Last approved sample reference, artwork version, color standard, carton dimensions, loading notes.
Testing & compliance

Market Standards & Testing Reports

We arrange third-party testing for destination markets on request. Test reports and material compliance documents are provided per buyer requirements.

Standard Scope Availability
EN 71-1/2/3 Toy safety (EU) Testing reports available upon request
ASTM F963 Toy safety (US) Testing reports available upon request
REACH Chemical substances (EU) Declaration available upon request
FDA Food Contact Paper tableware (US) Material compliance docs upon request
CA Prop 65 Chemical warnings (California) Compliance statement upon request
Procurement questions

Paper Cups with Logo FAQ

Can you match cups, plates, and napkins in one theme?

Yes. Collection-based production is one of the best ways to keep retail party sets consistent across artwork and colors.

What artwork format is best for paper cups?

Vector files (AI/EPS) are preferred for logos and graphics. High-res images work for full-color offset printing.

Do you support Pantone color matching?

Yes. Provide the Pantone (PMS) reference and we'll match it during sampling and production.

Can you make paper coffee cups with lids?

Yes. We produce single- and double-wall hot cups. Lids are available but sourced separately — we can quote together.

Are your paper cups food-safe for the US market?

Yes. Our PE-coated paper and inks meet FDA food contact standards. Material compliance docs provided on request.

Can you produce eco-friendly or compostable tableware?

We can source PLA-coated cups and uncoated plates for eco programs. Minimum quantities and lead times are longer.

What is the smallest order for a custom design?

Typically from 10,000 pcs per item. Exact MOQ depends on cup/plate size, print colors, and packaging.

Start a quote

Send Specs for Paper Cups with Logo

Attach artwork or describe the target product, quantity, package format, and destination market for a detailed quotation.