Source balloons, paper tableware, banners, backdrop boards, gift bags, and coordinated party collections from one export-ready manufacturing partner.
Latex, foil, number, confetti, and LED balloons in retail or bulk packs.
Cups, plates, napkins, and straws in coordinated party designs.
Bunting, banners, backdrops, hanging decorations, and themed kits.
Kraft and printed bags with handles, tags, and custom finishes.
Full party ranges in one theme across multiple SKUs.
Halloween, Christmas, New Year, and event-driven collections.
Each category uses its own print method — screen print for balloons, flexo/offset for paper, dye-sub or offset for decorations — coordinated to one artwork and color spec across the program.
| Product range | Balloons, paper tableware, decorations, gift bags, coordinated collections |
|---|---|
| Order structure | Single product, mixed-category PO, or full coordinated collection |
| Customization | Logo printing, private label, color matching, retail packaging |
| MOQ | By item — balloons from 3,000 pcs; tableware from 10,000 pcs; decor from 500 pcs |
| Sample lead time | 7–14 days depending on product mix |
| Bulk lead time | 20–40 days depending on categories and quantities |
| Packaging | Retail packs, header cards, barcodes, master cartons, mixed-SKU cartons |
| Documentation | Packing lists, carton marks, and buyer-specified compliance docs |
| Shipping terms | FOB, CIF, or DDP coordination with your forwarder |
| Compliance | EN71, ASTM F963, REACH, FDA test reports on request by category |
Multiple party items packed per carton for retail replenishment.
Coordinated sets packed and barcoded for shelf display.
Single-category master cartons for high-volume distribution.
Carton marks, packing lists, and import paperwork support.
Figures below are indicative and confirmed per final specification during quotation.
| MOQ | By item and category (see individual product pages) |
|---|---|
| Sample | 7–14 days depending on product mix |
| Bulk lead time | 20–40 days by program scope |
| Payment | 30% deposit, 70% balance before shipment (T/T) |
| Shipping | FOB / CIF / DDP via your forwarder or our coordination |
Clear input shortens quotation time and avoids sample rework. Use this checklist when sending a new program.
Type, size, material, print area, color count, target quantity per SKU.
AI/EPS/PDF files, Pantone colors, barcode files, and reference photos.
Bulk carton, retail box, header card, polybag, insert, or mixed-SKU set.
Destination country, safety standard, food-contact needs, and labeling language.
Target ship date, FOB/CIF/DDP terms, forwarder details, and carton limits.
Who signs off artwork, sample, pre-production proof, and final packing.
We prepare packaging details that buyers need after the product leaves the factory — not only the product itself.
| Barcode / SKU | UPC/EAN barcode printing or label application; SKU codes on retail pack and master carton. |
|---|---|
| Shelf display | Hang holes, header cards, window boxes, PDQ display trays, and shelf-ready cartons. |
| Language & warnings | Multi-language labels, choking hazard warnings, age grading, food-contact statements. |
| Packing photos | Pre-shipment packing photos showing retail pack, inner carton, master carton, and marks. |
| Repeat order file | Approved sample photos, artwork version, materials, print colors, and carton specs recorded. |
Importers and retailers need clear files for internal approval, customs, warehouse receiving, and repeat orders.
| Before production | Quotation sheet, proforma invoice, artwork proof, material confirmation, sample invoice. |
|---|---|
| During production | Production status photos, first-article print review, packing plan confirmation. |
| Before shipment | Packing list, commercial invoice, carton mark sheet, pre-shipment photos, test reports if ordered. |
| For repeat orders | Last approved sample reference, artwork version, color standard, carton dimensions, loading notes. |
We arrange third-party testing for destination markets on request. Test reports and material compliance documents are provided per buyer requirements.
| Standard | Scope | Availability |
|---|---|---|
| EN 71-1/2/3 | Toy safety (EU) | Testing reports available upon request |
| ASTM F963 | Toy safety (US) | Testing reports available upon request |
| REACH | Chemical substances (EU) | Declaration available upon request |
| FDA Food Contact | Paper tableware (US) | Material compliance docs upon request |
| CA Prop 65 | Chemical warnings (California) | Compliance statement upon request |
Yes. We coordinate balloons, paper cups, plates, napkins, banners, backdrops, and gift bags under one theme so colors and packaging stay consistent.
Importers, distributors, retailers, ecommerce sellers, event companies, and private label brands across 50+ markets.
Yes. Send the item list, quantities, artwork, target pack format, and destination country, and we'll quote the full program.
Yes. Mixed-SKU cartons are available for retail replenishment programs. We confirm carton configuration during quotation.
Standard terms are 30% deposit and 70% balance before shipment (T/T). We support FOB, CIF, and DDP shipping arrangements.
We focus on custom and OEM production. Some categories have semi-stock bases that reduce lead time — ask during quotation.
Attach artwork or describe the target product, quantity, package format, and destination market for a detailed quotation.