Turn artwork, themes, reference samples, and market ideas into production-ready party supplies with practical sampling, packaging, and export support.
You provide artwork and specs; we manufacture to your design and brand.
We adapt existing designs or develop new products from your concept.
Your brand on product, packaging, labels, barcodes, and inserts.
Send a physical sample; we review feasibility and reproduce it.
Coordinated multi-product themes designed as a retail range.
We prepare print-ready files from your logos and brand assets.
We adapt your brand assets to each product's print method and prepare print-ready artwork. Color proofs and physical samples are approved before bulk production.
| Service types | OEM, ODM, private label, reference sample reproduction, collection development |
|---|---|
| Customizable | Artwork, colors, sizes, materials, packaging, labels, barcodes |
| Artwork inputs | Vector files (AI/EPS/PDF) preferred; high-res raster reviewed for feasibility |
| Color matching | Pantone (PMS) or CMYK process matching with sample approval |
| MOQ | By product type — confirmed after spec review |
| Sample lead time | 7–14 days depending on product and complexity |
| Bulk lead time | 20–40 days depending on product and quantity |
| Packaging | Retail bags, boxes, header cards, labels, barcodes, inserts, carton marks |
| IP policy | Licensed/protected designs produced only with valid buyer authorization |
| Compliance | Destination-market testing (EN71, ASTM, REACH, FDA) on request |
Your logo and design on bags, boxes, and header cards.
Retail labels, UPC/EAN barcodes, and compliance markings.
Printed inserts, assembly guides, and promotional cards.
Buyer-specified shipping marks, packing lists, and documentation.
Figures below are indicative and confirmed per final specification during quotation.
| MOQ | By product type — confirmed after spec review |
|---|---|
| Sample | 7–14 days; sample fee refundable on bulk order |
| Bulk lead time | 20–40 days by product and quantity |
| Payment | 30% deposit, 70% balance before shipment (T/T) |
| Shipping | FOB / CIF / DDP via your forwarder or our coordination |
Clear input shortens quotation time and avoids sample rework. Use this checklist when sending a new program.
Type, size, material, print area, color count, target quantity per SKU.
AI/EPS/PDF files, Pantone colors, barcode files, and reference photos.
Bulk carton, retail box, header card, polybag, insert, or mixed-SKU set.
Destination country, safety standard, food-contact needs, and labeling language.
Target ship date, FOB/CIF/DDP terms, forwarder details, and carton limits.
Who signs off artwork, sample, pre-production proof, and final packing.
We prepare packaging details that buyers need after the product leaves the factory — not only the product itself.
| Barcode / SKU | UPC/EAN barcode printing or label application; SKU codes on retail pack and master carton. |
|---|---|
| Shelf display | Hang holes, header cards, window boxes, PDQ display trays, and shelf-ready cartons. |
| Language & warnings | Multi-language labels, choking hazard warnings, age grading, food-contact statements. |
| Packing photos | Pre-shipment packing photos showing retail pack, inner carton, master carton, and marks. |
| Repeat order file | Approved sample photos, artwork version, materials, print colors, and carton specs recorded. |
Importers and retailers need clear files for internal approval, customs, warehouse receiving, and repeat orders.
| Before production | Quotation sheet, proforma invoice, artwork proof, material confirmation, sample invoice. |
|---|---|
| During production | Production status photos, first-article print review, packing plan confirmation. |
| Before shipment | Packing list, commercial invoice, carton mark sheet, pre-shipment photos, test reports if ordered. |
| For repeat orders | Last approved sample reference, artwork version, color standard, carton dimensions, loading notes. |
We arrange third-party testing for destination markets on request. Test reports and material compliance documents are provided per buyer requirements.
| Standard | Scope | Availability |
|---|---|---|
| EN 71-1/2/3 | Toy safety (EU) | Testing reports available upon request |
| ASTM F963 | Toy safety (US) | Testing reports available upon request |
| REACH | Chemical substances (EU) | Declaration available upon request |
| FDA Food Contact | Paper tableware (US) | Material compliance docs upon request |
| CA Prop 65 | Chemical warnings (California) | Compliance statement upon request |
Yes. Send photos, dimensions, material notes, artwork, and target quantity, and we'll review feasibility and reproduce it.
Yes. We support labels, barcodes, bags, boxes, header cards, carton marks, and buyer-specific pack rules.
Yes. Graduation is a strong custom theme for banners, balloons, tableware, napkins, gift bags, and coordinated sets.
OEM means we produce to your finished design. ODM means we help develop or adapt the design before production.
Yes. We treat buyer artwork and designs as confidential and produce them exclusively for the commissioning buyer.
Only with valid buyer authorization for protected characters or brands. We do not produce unlicensed IP.
Send your concept, artwork, target product, quantity, and market. We'll review feasibility, quote, and propose a sampling plan.
Attach artwork or describe the target product, quantity, package format, and destination market for a detailed quotation.