Coated art paper has a clay or mineral coating that creates a smooth, bright white surface ideal for high-quality offset printing. It is the premium paper choice for gift bags, retail packaging, and backdrop boards where print quality and visual impact matter.
Key Properties
| Composition | Wood pulp base + mineral/clay coating layer |
|---|
| Grades | C1S (coated one side), C2S (coated two sides) |
|---|
| Weight range | 157–250 gsm for gift bags; 250–400 gsm for boxes and backdrops |
|---|
| Surface | Smooth, bright white — excellent ink holdout and print definition |
|---|
| Print quality | Excellent for offset CMYK — photo-quality reproduction |
|---|
| Finish options | Matte lamination, gloss lamination, soft-touch velvet, spot UV |
|---|
| Durability | Good with lamination; un-laminated surface is susceptible to scuffing |
|---|
| Recyclability | Recyclable but coating and lamination complicate the recycling process |
|---|
Grades & Variants
| C1S 157–200 gsm | Premium gift bags with one-sided print — most common premium bag spec |
|---|
| C2S 200–250 gsm | Two-sided print for euro totes and luxury bags |
|---|
| C1S 300–400 gsm | Retail packaging boxes, rigid backdrops — structural applications |
|---|
| Soft-touch laminated | Velvet/suede tactile finish — highest premium tier |
|---|
Compatible Processes
- Offset CMYK printing
- Matte/gloss/soft-touch lamination
- Hot foil stamping
- Spot UV coating
- Die-cutting
- Handle attachment (rope, ribbon)