The fastest-growing balloon product category: pre-assorted balloon garland and custom balloon arch kits with mixed sizes (5"–18"), coordinated color palettes, balloon decorating tape, glue dots, and step-by-step assembly instructions in retail-ready packaging.

DIY party decoration, retail party supply stores, ecommerce best-seller category, wedding and event decoration, and social media-driven party trends
| Kit contents | Assorted-size latex balloons (5", 10", 11", 12", 18"), balloon decorating strip/tape, glue dots, assembly instructions |
|---|---|
| Balloon count | Standard 50–150 balloons per kit depending on size and price point |
| Color palettes | Custom palettes — modern neutrals, bright party, pastel baby, metallic premium, seasonal themes |
| Finishes | Standard, metallic, agate/marble, and confetti — mixed or single finish per kit |
| MOQ | From 1,000–3,000 kits per design |
| Sample lead time | 10–14 days |
| Bulk lead time | 25–35 days |
| Packaging | Retail box with product window, polybag with header card, or gift-ready box |
| Compliance | EN71, ASTM F963 on request; choking hazard warning for small parts |
Assorted-size latex balloons (typically 50–150 pieces across 5 sizes), balloon decorating strip/tape, glue dots for attaching balloons, and printed step-by-step assembly instructions. The kit contains everything needed to create a balloon garland or arch.
Yes. Provide your color palette — Pantone references or a visual mood board — and we'll select matching balloon finishes across standard, metallic, pastel, agate, and confetti options.
Typical mix: 5" (filler), 10" (standard), 11" (main), 12" (large), and 18" (statement). The exact mix depends on the desired garland look. We can adjust the size distribution per your requirements.
Retail boxes with a product window (showing balloon colors) are the most effective. Header-card polybags are the budget option. Gift-ready premium boxes command the highest retail price point.
Send your specifications, quantity, and target market. We'll prepare a detailed quotation with sampling options.