Natural latex balloons with custom logo printing, manufactured in Zhejiang from Southeast Asian natural latex. Standard, metallic, pastel, agate, crystal, and chrome finishes available with sampling before bulk production.

Retail party packs, promotional giveaways, event decoration, balloon garland kits, corporate branding, and wholesale distribution
| Material | 100% natural latex from Southeast Asia |
|---|---|
| Sizes | 5", 9", 11", 12", 16", 18", 24", 36" |
| Printing | 1–4 color screen print, one-side, two-side, or full-wrap 360° |
| Finishes | Standard, metallic, pastel, agate/marble, crystal clear, chrome |
| Helium grade | Standard latex floats 8–12 hours; Hi-Float treatment extends to 24+ hours |
| MOQ | From 3,000 pcs per printed design (indicative) |
| Sample lead time | 7–10 days after artwork approval |
| Bulk lead time | 20–35 days depending on quantity and print complexity |
| Packaging | Polybag bulk, header card hang pack, printed gift box, or custom retail pack |
| Compliance | EN71-1/2/3, ASTM F963, REACH test reports on request |
Indicatively from 3,000 pieces per printed design. Exact MOQ depends on size, number of print colors, and packaging — confirmed per quotation.
Screen printing supports 1–4 solid spot colors. It does not reproduce photographic images or smooth gradients. For full-color designs, foil balloons with pre-printed film are the alternative.
Properly stored (cool, dry, away from direct sunlight), latex balloons have a shelf life of approximately 12 months. Metallic and chrome finishes may oxidize slightly over time.
Yes. Natural latex rubber is biodegradable under composting conditions — it decomposes at roughly the same rate as an oak leaf. We can provide ASTM D5511 test reports to verify the claim.
Send your specifications, quantity, and target market. We'll prepare a detailed quotation with sampling options.