Custom kraft paper gift bags for retail, grocery, and party programs. Natural brown or bleached white kraft with twisted or flat paper handles, flexographic logo printing, and FSC-certified paper options.

Retail shopping bags, party favor bags, grocery and market bags, eco-conscious brand packaging, and everyday gift packaging
| Material | Natural or bleached white kraft paper, 100–180 gsm |
|---|---|
| Sizes | Small (5×7"), medium (8×10"), large (10×13"), jumbo (16×19") — custom sizes available |
| Handles | Twisted paper (standard), flat paper (wider, more comfortable), or die-cut integrated |
| Printing | Flexographic 1–4 colors; screen print for simple designs |
| FSC option | FSC-certified kraft paper available on request (5–15% cost premium) |
| MOQ | From 5,000 pcs per printed design |
| Sample lead time | 10–12 days after artwork and structure approval |
| Bulk lead time | 25–35 days |
| Packaging | Flat-packed in master cartons; retail bundling optional |
| Compliance | Food-safe inks available for food-contact bags |
Natural kraft has the classic brown paper look — popular for eco-conscious and rustic branding. White kraft is bleached for a cleaner, brighter appearance — better for full-color printing. Both are available in the same weight range.
Yes. Kraft paper bags are recyclable in standard paper recycling streams when uncoated and un-laminated. Twisted paper handles are also recyclable. FSC-certified kraft adds verified sustainable forestry sourcing.
Twisted paper handles are the most common and lowest cost — good for loads up to 5 kg. Flat paper handles are wider and more comfortable for heavier loads. Die-cut handles are integrated into the bag — clean modern look but lower weight capacity.
Yes. Custom sizes require new cutting dies (tooling cost approximately $50–100, 7–10 days additional lead time). Standard sizes have lower MOQ and faster turnaround.
Send your specifications, quantity, and target market. We'll prepare a detailed quotation with sampling options.