Custom-printed paper cups for coffee shops, cafes, restaurants, and corporate food service. Single-wall, double-wall, and ripple-wall construction with flexographic or offset logo printing.

Coffee shop and cafe service, restaurant takeaway, corporate office coffee programs, catering and event beverage service, and retail private label coffee cup packs
| Cup types | Single-wall, double-wall (insulated), ripple-wall (textured grip) |
|---|---|
| Sizes | 4oz, 7oz, 8oz, 9oz, 12oz, 16oz, 22oz |
| Material | Food-grade PE-coated paper; PLA-coated available for compostable programs |
| Printing | Flexographic (1–6 spot colors) or offset (full CMYK) |
| Lids | Compatible lid sourcing available — specify when ordering |
| MOQ | From 10,000 pcs per design (single-wall); 15,000–20,000 (double/ripple) |
| Sample lead time | 10–14 days after artwork approval |
| Bulk lead time | 25–40 days depending on construction and print |
| Packaging | Shrink-wrapped sleeves, retail-ready boxes, or bulk master cartons |
| Compliance | FDA 21 CFR 176.170, EU 1935/2004, LFGB test reports on request |
Double-wall cups insulate without a separate sleeve — better user experience and branding opportunity (both walls printable). Single-wall cups require a separate sleeve for hot drinks. Double-wall costs roughly 2× single-wall per unit.
Yes. Offset printing delivers full CMYK color reproduction with photo-quality detail. Flexographic printing is better for 1–3 spot colors and solid logos. Send your artwork and we'll recommend the best method.
PLA-coated cups are industrially compostable (EN 13432 certified). PE-coated cups are technically recyclable but require specialized facilities. PLA costs more and has a shorter shelf life than PE. Specify compostable requirements when quoting.
Yes. We can source and quote compatible lids alongside your cup order. Lid type depends on cup size, material, and rim design. Specify 'with lids' in your RFQ.
Send your specifications, quantity, and target market. We'll prepare a detailed quotation with sampling options.