Complete tableware collections with matching cups, plates, napkins, and optional straws — designed, printed, and packaged as a coordinated retail product line with consistent artwork and colors.

Retail party collections, private label tableware brands, seasonal retail programs, gift and celebration sets, and ecommerce party bundles
| Set contents | Cups (1–2 sizes) + plates (1–2 sizes) + napkins (1–2 sizes) + optional straws |
|---|---|
| Set sizes | Small (serves 8–12), medium (serves 16–24), large (serves 24–48) |
| Design | Coordinated artwork and colors across all items in the set |
| Printing | Flexo or offset — consistent method across all items for color match |
| MOQ | From 2,000–5,000 sets per design (depending on set size and components) |
| Sample lead time | 10–14 days for complete set sample |
| Bulk lead time | 25–40 days depending on set complexity |
| Packaging | Retail box with window, shrink-wrapped bundle, or gift-ready packaging |
| Compliance | FDA, EU food contact test reports per item in the set |
Yes. This is our most common tableware order type. We design and produce matching cups, plates, napkins, and straws with coordinated artwork, colors, and packaging for retail sale.
Medium sets (serving 16–24) are the sweet spot — good value perception, manageable package size for shelf display, and the right price point for most retail channels.
Yes. The retail box, individual item packaging, and even the products themselves can carry your brand. We coordinate artwork placement across all components for a consistent branded look.
We use the same Pantone references and printing method (flexo or offset) across all items. Physical swatch and sample approval before bulk production ensures color consistency.
Send your specifications, quantity, and target market. We'll prepare a detailed quotation with sampling options.