Custom photo backdrop boards for parties, events, retail displays, and social media photo opportunities. Cardboard or foam-core construction with full-color offset printing — foldable for shipping or rigid for premium presentation.

Party photo walls, event and wedding backdrops, retail window displays, trade show booth backdrops, and social media photo booth backgrounds
| Backdrop types | Cardboard (single-use), foam-core (rigid, reusable), fabric (dye-sub, reusable) |
|---|---|
| Sizes | Custom — common: 1×1.5m, 1.5×2m, 2×2.5m; larger sizes may be multi-panel |
| Materials | Coated cardboard, foam-core board, or polyester fabric |
| Printing | Offset CMYK (cardboard/foam-core); dye-sublimation (fabric) |
| Structure | Foldable (creases for shipping), rigid (single panel), or multi-panel with connectors |
| Finishing | Matte or gloss lamination; reinforced edges for rigid boards |
| MOQ | From 500–1,000 pcs per design (cardboard); 200–500 (foam-core); 300–500 (fabric) |
| Sample lead time | 10–14 days |
| Bulk lead time | 20–30 days |
| Packaging | Flat-packed with corner protection; rolled for fabric |
Cardboard is the most cost-effective for single-use events — good print quality, lightweight, recyclable. Foam-core is rigid and reusable — better for retail displays and repeated event use. Fabric is the premium reusable option — rolls for storage, machine-washable (polyester).
Yes. Backdrops larger than approximately 1.5×2m are typically produced as multi-panel systems with connectors or overlapping edges. Fabric backdrops can be produced in larger single pieces. Provide your target size for a feasibility assessment.
Yes. Offset CMYK printing on cardboard and foam-core, and dye-sublimation on fabric, both support full-color photographic images. Provide high-resolution images (300 dpi at print size) for best results.
Cardboard backdrops fold for shipping (fold lines are part of the design). Foam-core ships flat with corner protection. Fabric backdrops roll for compact shipping. Freight cost varies significantly by packaging method — we quote the most cost-effective option per design.
Send your specifications, quantity, and target market. We'll prepare a detailed quotation with sampling options.